Skip to content
The submarine "Suffren" reaches its base port with out saying itself

Neither bugle nor crier in public: regardless of the occasion that this represents for the French naval forces, the arrival at its base port of Suffren, the model new French nuclear assault submarine (SNA), has not been the topic of any prior communication from the Ministry of the Armed Forces. The ship is because of emerge within the harbor of Toulon on Sunday July 26, earlier than reaching the quays of the SNA squadron on Wednesday.

The Suffren, first of the six Barracuda class submarines, comes from the Cherbourg shipyards (Manche) the place it accomplished the primary a part of its checks, below the supervision of the French industrialist Naval Group and the duty of the Normal Administration armament. The crew of the Suffren should take just a little relaxation, earlier than persevering with to start out the boat: after having checked its propulsion and maneuverability within the Channel, it should take a look at its fight system within the Mediterranean, till October.

However the critical hearth that endangered on June 13 its elder, the submarine Pearl, cloud the ambiance. The ship, born in 1993, was additionally on the shipyard, in Toulon, for a whole renovation that was to increase its operational life within the strategic oceanic pressure till a minimum of 2030. The SNA was subjected for fourteen hours to an intense blaze. Proper after the hearth, specialists estimated that the Pearl might need suffered an excessive amount of harm to her thick hull to sail once more.

Attainable restoration for the "Pearl"

The Minister of the Armed Forces, Florence Parly, had requested for the primary technical parts "For July", in order that the armies have an thought of ​​the repairability of the ship. The investigations are delayed and their conclusions haven’t but reached him, though the ministry specifies that "It shouldn’t delay".

The outcomes are stored in secret, as a result of litigation which is able to inevitably come up between the French Navy and Naval Group, accountable for the ship through the work. The latter was not on time, which was accentuated by the confinement of employees through the Covid-19 epidemic, already inflicting tensions between the workers and the corporate.

Article reserved for our subscribers Learn additionally The submarine "Perle" burned down, a serious loss for navy operations

If a restore of the Pearl is feasible, it should stay to judge the price, which could possibly be dissuasive for the price range of the armies. If its destruction is confirmed, one other human, technical and monetary problem presents itself, that of accelerating the Barracuda program. It represents an funding of greater than 9 billion euros. The final SNA is due for supply in 2029. These ships shall be in use till the 2060s.

You have got 0% of this text left to learn. The remaining is for subscribers solely.

Comments